top of page

Car Park Resurfacing & Groundworks at Five Villages Hall, Chester

  • Writer: oeservices1
    oeservices1
  • Sep 11, 2025
  • 2 min read

At Ollie Edward Services, we specialise in high-quality groundworks in Chester and the surrounding areas, from car park resurfacing to kerb installations and operator hire. One of our most recent large-scale projects was at Five Villages Hall in Chester—a job that had been in planning for almost a year. With careful consultation and detailed planning, we worked closely with the client to ensure the final result was exactly what they needed.



The Challenge



The hall’s car park had been causing ongoing issues for visitors. The original surface material wasn’t suitable, making it difficult underfoot and inconvenient to walk on. Like many gravel or stone car parks, there were loose and uneven areas that needed to be addressed. The client wanted a long-lasting, budget-friendly solution that improved safety and usability.



Our Solution: Capping the Car Park



After extensive discussions, we agreed to cap the car park. Capping involves removing the top layer of larger, loose stones and replacing it with a fine, compactable material. For this project, we used approximately 85 tonnes of Grano dust, creating a smooth and durable surface.


To achieve the best possible finish, we utilised:


  • A 5-ton excavator

  • A 3-ton dumper

  • A ride-on roller for proper compaction and a professional finish



This process significantly improved the overall safety, appearance, and usability of the car park.



Added Service: Installing Kerb Edgings



The client also chose an optional upgrade—installing kerb edgings around the car park. Kerbs provide a strong, clean outline while adding long-term durability to the space.


To complete this, we used a kerb lifter attachment to reduce manual handling and improve safety. Trenches were dug, a slump concrete base was laid, and everything was backfilled with concrete—using approximately 11m³ in total. The kerbs gave the car park a polished, well-defined look.



Optional Extra: Repainting Disabled Bays



Accessibility is a key consideration in any public space. As part of this project, we also repainted and installed four disabled parking bays, all laid out to regulation standards using high-quality, long-lasting paint. These markings not only improve visibility but also ensure the car park meets accessibility requirements for visitors.



The Finished Result



The end result was a safer, smarter, and more accessible car park. While stone-based car parks will always require occasional rolling and levelling over time, this upgrade has given Five Villages Hall a durable and practical surface that will serve the community for years to come.



Why Choose Ollie Edward Services?



At Ollie Edward Services, we may be a small company, but we deliver big results. We specialise in:


  • Car park resurfacing in Chester

  • Kerb installation and edging

  • Disabled bay markings and repainting

  • General groundworks and operator hire



We always prioritise safety, efficiency, and customer satisfaction—never leaving a job until our clients are happy.


If you’re looking for professional groundworks in Chester or the wider Cheshire area or in north wales

, get in touch with Ollie Edward Services today. Whether you need a car park resurfaced, kerbs installed, or a qualified operator for your project, we have the skills, equipment, and dedication to deliver.


📞 Contact us today to discuss your project and get a free consultation.

Comments


Ollie Edward Services, External Cleaning & Property Maintenance Solutions

Discover our wide range of services tailored for homeowners, property managers, and commercial clients. Gutter Cleaning Near Me.

Mold, Wales, UK

Our Services

Gutter Cleaning

Fascia & Soffit Cleaning

Gutter Repairs

Installations

Site Clearance 

Property Maintenance

Groundworks

IPAF Operator 

PASMA User Hire 

bottom of page